See project information online:
http://www.ccroadwise.org/bee_st_and_courtenay_dr.html
Traffic Alert:
Temporary Lane Shift for Bee Street and Courtenay Drive Improvement
Project
Charleston County Government announces the following traffic alerts
for the
Bee Street and Courtenay Drive Improvement Project:
Bee
Street
July 29 and July 30:
-
On Thursday, July 29 and Friday, July 30, a lane shift will occur
for utility work on Bee Street from Courtenay Street to President
Street.
-
The work will occur during the day between 9 a.m. and 4 p.m.
-
On-street parking will be blocked off in this area so that two-way
directional traffic can be maintained.
Previously announced and ongoing Bee Street road work:
-
Bee Street will be closed in both directions between Courtenay Drive
and Bravo Street.
June 28 through August 28:
-
Beginning the week of June 28, lane closures will occur for water
line relocation work on Bee Street from Cherry Street to Lockwood
Boulevard.
-
The approximate duration of this work is 45 to 60 days.
-
An 11-foot lane will be maintained in each direction and no
on-street parking will be permitted.
-
During this time, the main entrance to the
Ralph H. Johnson VA Medical Center may be blocked at times and
traffic will be directed to use the entrance on Bravo Street.
-
Flagmen will be on site directing traffic.
Previously announced and ongoing Courtenay Drive road work:
July 6 through September 30:
-
On Sunday, July 6, lane shifts will occur on Courtenay Drive from
Cannon Street to Ralph Johnson Drive.
-
The work will occur during the day and night.
-
One lane will remain open in each direction to minimize the impact
on traffic.
-
Since Sunday, July 11, the sidewalk in front of
MUSC’s Wellness Center and Harper Student Center along Courtenay
Drive from Bee Street to Ralph Johnson Drive has been closed.
Pedestrians are being directed to the east side of Courtenay Drive;
they can cross at Ralph H. Johnson Drive to access the Wellness
Center and Student Center through the driveway along Ralph H.
Johnson Drive or along Bravo Street.
Main entrance closed to MUSC parking garage:
·
The work on Bee Street will require the closure of the main
entrance of the MUSC parking garage located at the corner of Bee Street
and Courtenay Drive.
·
Access to the garage will be available through the rear entrance
across from Bravo Street as indicated by detour signs.
·
The detour will route motorists from Courtenay Drive along Ralph H.
Johnson Drive to Bravo Street. Motorists will then cross Bee Street and
go in the rear entrance of the garage.
The public is asked to take notice of traffic control signs and message
board information. All road work is dependent on the weather.
Every effort is being made to schedule necessary lane closures for the
project during off- peak, nighttime and weekend hours when possible.
The project, which is expected to be completed in less than a year, is
funded by the
Charleston County Transportation Sales Tax and managed by the
Charleston County RoadWise Program. Charleston County RoadWise is the
name of
Charleston County Government’s management program for the
construction of roads, highways, resurfacing, paving and drainage
projects that are funded by the Transportation Sales Tax.
Visit the official Web site at
www.ccroadwise.org for public meeting notices and up-to-date news
and information about all Charleston County Transportation Sales Tax
projects.
The public can get up-to-date project information on the Bee Street and
Courtenay Drive Improvement Project, including construction status and
traffic alerts, online at
http://www.ccroadwise.org/bee_st_and_courtenay_dr.html. Comments may
be submitted online at
http://www.ccroadwise.org/bee_st_and_courtenay_dr.html#Comment.
|